Extra 10% off 100s products with code: MAYDAY10

Extra 10% off 100s products with code: MAYDAY10

Hotpoint C HD 94M WBS UK 9kg Heat Pump Tumble Dryer - White
£519.00

Hotpoint C HD 94M WBS UK 9kg Heat Pump Tumble Dryer - White

  • Heat Pump Design
  • 9kg Drum Capacity
  • PetHairCare
  • HomeWhiz App Connection
  • FastDry - 5kg Dry in 1hr
  • 16 Drying Programmes
Product Description

The Hotpoint C HD 94M WBS UK 9kg Heat Pump Tumble Dryer in stylish white is designed for busy households, this advanced tumble dryer features a spacious 9kg drum, making it ideal for families or anyone with larger laundry loads.

Enjoy cleaner results with the innovative PetHairCare feature, specially developed to help remove stubborn pet hair from your washing. Whether you are drying clothing, bedding, or your favourite pet blanket, you can trust this Hotpoint dryer to deliver outstanding performance and fresher results every time.

Your new Hotpoint C HD 94M WBS UK 9kg Heat Pump Tumble Dryer also a FastDry programme, allowing you to dry up to 5kg of laundry in just one hour perfect for busy schedules or last-minute needs.

Stay connected and in control with HomeWhiz app compatibility, which allows you to monitor and manage your tumble dryer from your smartphone or tablet. Start or pause cycles, receive notifications, and access useful care tips all at your fingertips.

Annual Energy Consumption
194
Colour Of Unit
White
Condenser Efficiency Grade
A
Dryer Temperatures
5
Energy Efficiency Class
A+++
Energy Full Load
1.06
Energy Half Load
1.06
Energy Rating
A+++
Filter Full Indicator
Yes
Final Cool Cycle
No
Full Load Cycle Time in mins
3:15
Half Load Cycle Time in mins
2:00
Half load option
No
Heat Pump
Yes
Loading Type
Front
Max Time on Timer in mins
1440
Noise Level
64
Number of programmes
15
Sensor Drying
Yes
Smart Dryer
Yes
Timer delay
Yes
Time remaining indicator
Yes
Tumble Dryer Type
Heat Pump
Vent Hose Included
No
Venting Position
Front
Load Capacity in kg
9
Height in mm
846
Width in mm
598
Depth in mm
672
Weight in kg
45
Guarantee
1 Year

£519.00

Black Black
Grey Grey
White White
Choose Colour
Stock Availability:
In stock
Delivery & Collection availability
Delivery -
Delivery available Delivery available
Collection -
Collection available Collection available
Delivery
Goods will be delivered to a room of your choice. A delivery window will be supplied via SMS (where a mobile phone number is provided) or email, prior to delivery. Please let us know if there may be any accessibility issues, such as living up several flights of stairs or having restricted access to your property, as soon as possible after placing your order. Please take care to inspect your product for any damages or shortages and reject the delivery if necessary. Damages and shortages must be reported to us within 48 hours. Please find our full contact information here: https://www.hughes.co.uk/contact-us
*Check availability and add at checkout
Unpack and take away packaging
Your appliance will be delivered to a room of your choice and unboxed, with the packaging taken away by the courier. Please take this opportunity to inspect for damages and/or shortages. You can reject your delivery where required, or contact us within 48 hours to advise. We must receive this information with 48 hours of delivery in order to take action with the courier.
*Check availability and add at checkout
Recycle your old appliance
(WEEE). The delivery crew will take away your old appliance when they deliver your new one. Please ensure that the item has been disconnected and, where applicable, free from any water/defrosted in advance of your delivery. Built-in appliances must be fully disconnected and removed from the housing, with any fascia panels removed. Please note that, if the service cannot be carried out upon delivery, it is unable to be rebooked.
*Check availability and add at checkout
Please enter your delivery postcode to check available dates. You can select your preferred date at checkout.
Enter your postcode to check availability at your local Hughes store:
Add peace of mind with Hughes Care
What's Covered
Repairs for accidental damage - starting today
A replacement of same or similar specification - we'll cover installation costs up to £50 for white, laundry and TV products
Call-outs, parts and labour included, with no excess to pay
What's not covered
Cosmetic and malicious damage
Costs that you may incur due to your product being unusable
Installation and disposal charges for a replacement product
Please read the Policy Terms & Conditions and Privacy Policy before continuing.

This insurance policy is designed to meet the demands and needs of those who wish to insure their electronic appliances and/or household goods against breakdown and accidental damage.

Full details of the policy, including how to submit a complaint, can be found in the Terms & Conditions.

Provided by Domestic & General Insurance PLC who are an insurer not an intermediary and who do not give recommendations or advice.

The price includes all applicable taxes.
Domestic & General is trusted by millions of customers to protect, repair and replace their appliances
Powered by Domestic & General
Please confirm the following:
  • Heat Pump Design
  • 9kg Drum Capacity
  • PetHairCare
  • HomeWhiz App Connection
  • FastDry - 5kg Dry in 1hr
  • 16 Drying Programmes
Product Description

The Hotpoint C HD 94M WBS UK 9kg Heat Pump Tumble Dryer in stylish white is designed for busy households, this advanced tumble dryer features a spacious 9kg drum, making it ideal for families or anyone with larger laundry loads.

Enjoy cleaner results with the innovative PetHairCare feature, specially developed to help remove stubborn pet hair from your washing. Whether you are drying clothing, bedding, or your favourite pet blanket, you can trust this Hotpoint dryer to deliver outstanding performance and fresher results every time.

Your new Hotpoint C HD 94M WBS UK 9kg Heat Pump Tumble Dryer also a FastDry programme, allowing you to dry up to 5kg of laundry in just one hour perfect for busy schedules or last-minute needs.

Stay connected and in control with HomeWhiz app compatibility, which allows you to monitor and manage your tumble dryer from your smartphone or tablet. Start or pause cycles, receive notifications, and access useful care tips all at your fingertips.

Annual Energy Consumption
194
Colour Of Unit
White
Condenser Efficiency Grade
A
Dryer Temperatures
5
Energy Efficiency Class
A+++
Energy Full Load
1.06
Energy Half Load
1.06
Energy Rating
A+++
Filter Full Indicator
Yes
Final Cool Cycle
No
Full Load Cycle Time in mins
3:15
Half Load Cycle Time in mins
2:00
Half load option
No
Heat Pump
Yes
Loading Type
Front
Max Time on Timer in mins
1440
Noise Level
64
Number of programmes
15
Sensor Drying
Yes
Smart Dryer
Yes
Timer delay
Yes
Time remaining indicator
Yes
Tumble Dryer Type
Heat Pump
Vent Hose Included
No
Venting Position
Front
Load Capacity in kg
9
Height in mm
846
Width in mm
598
Depth in mm
672
Weight in kg
45
Guarantee
1 Year